蜜桃在线视频,欧美网站免费观看在线,亚洲男人的天堂在线aⅴ视频,少妇性xxxxxxxxx色孕交

Purchasing skills of drain pump

Date of issue:[2020-08-17]     Click through rate:    

The drainage pumps used in the building include submersible sewage pump, underwater drainage pump, vertical sewage pump and horizontal sewage pump. As the general site in the building is small and the displacement is not large, the submersible sewage pump and submerged drainage pump can be preferred for the drainage pump, among which the submerged sewage pump is generally used in important places; the vertical sewage pump and horizontal sewage pump are required to be equipped with isolation foundation, self irrigation water absorption, and occupy a certain space, so they are rarely used in buildings.

The flow rate of the drainage pump should be selected according to the design second flow rate of domestic drainage; when there is displacement adjustment, it can be selected according to the maximum hourly flow of domestic drainage. The flow rate of drainage pump in fire elevator sump shall not be less than 10L / s. After the head of the drainage pump is determined according to the lifting height and pipeline loss, a certain free head is added. The free head should be 0.02-0.03mpa. The velocity of suction pipe and outlet pipe of drainage pump should not be less than 0.7m/s and should not be greater than 2.0m/s. A standby pump should be set in each domestic drainage sump in public buildings, which should be operated interactively at ordinary times. If there are two or more drainage pumps for the basement, equipment room and garage, the pump can not be used. When the emergency drainage pipe cannot be set in the sump, the pump shall have uninterrupted power supply; when the drainage inlet pipe can be closed, the uninterrupted power supply can not be set, but alarm device shall be set.

When lifting the sewage and wastewater with large impurities, the outlet pipes of submersible sewage pumps in different catchments should not be discharged together; when lifting general wastewater, the outlet pipes of submersible sewage pumps in different catchments can be combined and discharged according to the actual situation. When two or more pumps share one outlet pipe, valves and check valves shall be installed on the outlet pipe of each pump. Check valve should be set when single pump drainage may cause backflow. It is not allowed to discharge the pressure drain and gravity drain pipe in the building. When the submersible sewage pump lifting contains large debris, the submersible sewage pump should be equipped with crushing device; when lifting sewage containing more fiber, large channel submersible sewage pump should be used.

When the motor power of submersible sewage pump is greater than or equal to 7.5kW or the outlet diameter is greater than or equal to DN 100, the fixed auto coupling device of the pump can be used; when the motor power of the submersible sewage pump is less than 7.5kW or the diameter of the outlet is less than DN 100, the mobile installation of the hose can be set. When the submersible sewage pump is used to drain the sewage sump, the pump fixed auto coupling device should be set to facilitate the maintenance of the pump. The drainage pump shall be able to start and stop automatically and manually on site. Multiple pumps can be operated alternately in parallel or in sections.

Technology Department


男ji大巴进入女人的网站 | 色狠狠热噜噜噜| 一区二区三区日本久久九| 好紧好爽好深再快点AV在线| 国产三级三级三级| 亚洲天堂2020| 国产成人手机高清在线观看网站 | 亚洲男人的天堂网站| 人妻尝试又大又粗久久 | 欧美videosex性极品hd| 饱满的水蜜桃2| 自拍亚洲一区欧美另类| 国产精品毛片在线完整版| 国产又爽又黄又无遮挡的激情视频 | 久久精品人人爽人人爽视色观看| 老熟妇BBXXX视频| 成人国产一区二区三区精品| 国产乱给妹疏通下水道| 狠狠狠操| 精品一区二区ww| 成人区人妻精品一区二区不卡| 麻豆国产原创视频在线播放| 亚洲中文字幕波多野结衣| 久久精选视频| 亚洲av电影天堂| h在线免费观看| 色呦呦91高清| 亚洲日韩欧美视频二区国产| 久久亚洲国产中文香蕉视频| av一本久道久久波多野结衣| 精品无码久久久久久国产 | 久久久久99精品成人品| 熟女| 97人妻精品一区二区三区| 日本1区| 欧美产精品一线二线三线| 国产真人做爰免费视频| 韩国午夜理论在线观看| www.色五月| 亚洲av综合色区无码一区| AV无码一区二区三区|